Originally Posted by onebads10
i have them building me a 434 sbc right now. i had talked to a few other people about building me the engine. after talking to Pat on the phone and how he was willing to work with me. i decided that he would be the one to build it and seemed very straight forward about everything. he said 3 to 4 weeks to build the engine.
Have never dealt with Nyes, but you can be pertty sure that with any machine shop 3 weeks is really 9 weeks and 6 weeks is 18.